Replacement of 6 boiler chimneys, each 30 meters tall Client: REA KALTIM PLANTATIONS LTD Facebook-f Instagram Twitter Category: MECHANICAL Location KALTIM Situation Task Action Result The plant’s six 30-meter-tall boiler stacks have reached the end of their service life and are suffering from severe corrosion and a decline in structural integrity. These conditions pose operational […]
Upgrades to the hydraulic systems of the sterilizer doors and bridges Client: REA KALTIM PLANTATIONS LTD. Facebook-f Instagram Twitter Category: MECHANICAL Location: KALTIM Situation Task Action Results The sterilizer doors and drawbridge at the plant are still operated manually, which increases safety risks for operators and leads to inconsistent operational cycle times. This situation has […]
Replacement of the inner lining of the door and body of the Sterlizer made of stainless steel Client: REA KALTIM PLANTATIONS LTD. Facebook-f Instagram Twitter Category: MECHANICAL Location: KALTIM Situation Task Action Results The linings on the doors and body of the factory’s sterilizer are subject to wear and tear due to exposure to high-temperature […]
- 1
- 2