Pucuk Jaya Ltd.

Delivery of 5 New Sterilization Cages Pucuk Jaya Factory Project Client: PUCUK JAYA LTD. Facebook-f Instagram Twitter Category: MECHANICAL  Location: KALTIM Situation Task Action Results The mill requires additional cage sterilizers to support increased Fresh Fruit Bunch (FFB) throughput and to replace older units that have worn out due to long-term operation. This is essential […]

Kutai Balian Nauli Ltd.

Replacement of the Boiler Flue and 30-Meter Exhaust Pipe Client: KUTAI BALIAN NAULI LTD. Facebook-f Instagram Twitter Category: MECHANICAL Location: KALTIM Situation Task Action Results The 30-meter-tall boiler stack and the flue gas ducting system at the plant have deteriorated due to age and exposure to extreme operating conditions. These conditions pose a risk to […]

Kutai Balian Nauli Ltd.

Supply of 5 new sterilization chambers, including fabrication and welding services Client: PT KUTAI BALIAN NAULI Facebook-f Instagram Twitter Category: MECHANICAL Location: KALTIM Situation Task Action Results The factory needs additional cage sterilizers to increase sterilization capacity and replace the old units, which have worn out due to long-term use. The new equipment must meet […]

Rea Kaltim Plantations Ltd.

A 600-meter-long CPO pipeline featuring Class 1 welding and non-destructive testing (NDT) Client: REA KALTIM PLANTATIONS LTD. Facebook-f Instagram Twitter Category: MECHANICAL Location: KALTIM Situation Task Action Results The factory requires a new CPO (Crude Palm Oil) transfer pipeline from the storage area to the loading point at the jetty to support export operations. Given […]

Rea Kaltim Plantations Ltd.

Replacement of 6 boiler chimneys, each 30 meters tall Client: REA KALTIM PLANTATIONS LTD Facebook-f Instagram Twitter Category: MECHANICAL Location KALTIM Situation Task Action Result The plant’s six 30-meter-tall boiler stacks have reached the end of their service life and are suffering from severe corrosion and a decline in structural integrity. These conditions pose operational […]

Rea Kaltim Plantations Ltd.

Upgrades to the hydraulic systems of the sterilizer doors and bridges Client: REA KALTIM PLANTATIONS LTD. Facebook-f Instagram Twitter Category: MECHANICAL Location: KALTIM Situation Task Action Results The sterilizer doors and drawbridge at the plant are still operated manually, which increases safety risks for operators and leads to inconsistent operational cycle times. This situation has […]

  • 1
  • 2