The factory requires new main distribution panels and motor starter panels to support a more reliable electrical distribution system throughout its operational areas. The existing system is no longer capable of meeting the growing demands for load capacity and operational reliability.
Carry out the design, fabrication, and procurement of electrical panels that meet PUIL standards, including factory acceptance testing (FAT). The panels must be capable of supporting stable, safe, and adequate power distribution for all of the plant’s operational units.
Our team designs panels tailored to the requirements of the distribution system, procures electrical components, and handles the complete fabrication and wiring of the panels. Once assembly is complete, comprehensive testing is conducted, including dielectric (insulation) tests, continuity tests, and functional testing of all protection and control circuits to ensure compliance with applicable technical standards.