The estate requires a 2-kilometer overhead power line to support operational needs throughout the entire area. The existing system was unable to ensure a reliable and consistent power supply, making it necessary to construct a new, more stable network that complies with applicable electrical standards.
Carry out the turnkey design and installation of a 2-kilometer overhead electrical distribution network, including coordination with local electrical authorities. The work must comply with PUIL standards and ensure that the system can be operated safely, reliably, and in accordance with the estate’s load requirements.
Our team conducted a route survey, procured pole and conductor materials, and carried out pole erection and cable stringing work. The entire installation process was carried out in accordance with PUIL standards under strict safety supervision. Upon completion of the work, testing and system energization were performed, and a complete set of as-built drawings was prepared for submission to the client.