Project to Replace All Pipes in Atmindo’s 32-Ton-Per-Hour Water-Tube Boiler Client: REA KALTIM PLANTATIONS LTD. Facebook-f Instagram Twitter Category: BOILER Location: KALTIM Situation Task Action Results Atmindo’s 32-ton-per-hour water-tube boiler has deteriorated due to the pipes reaching the end of their operational lifespan. This situation could disrupt the continuity of the steam supply for the […]
Categories: Boiler